dc.contributor.author |
Coetzer, S
|
|
dc.date.accessioned |
2007-11-01T07:13:21Z |
|
dc.date.available |
2007-11-01T07:13:21Z |
|
dc.date.issued |
1997-06 |
|
dc.identifier.citation |
Coetzer, S. 1997. Conceptual development of a method to determine the principal stresses around coal mine workings to ensure safe mine design. Safety in Mine Research Advisory Committee, COL 326, June, 1997, pp 1-49 |
en |
dc.identifier.uri |
http://hdl.handle.net/10204/1416
|
|
dc.description.abstract |
The objective of this project is to identify or to develop methods or procedures for the determination of the principal stresses in coal mine workings, which in turn would provide improved criteria for mine design layouts in coal mines. To address the objective a survey of 52 papers was carried out to identify methods which could be of use for the determination of in situ stresses in coal mines. This survey showed that the majority of methods used to measure stress in coal seam and then over-cored by a larger diameter hole which results in the stresses acting on the sensor being relaxed |
en |
dc.language.iso |
en |
en |
dc.subject |
SIMRAC |
en |
dc.subject |
COL 326 |
en |
dc.subject |
Safe mine design |
en |
dc.subject |
Coal mine workings |
en |
dc.title |
Conceptual development of a method to determine the principal stresses around coal mine workings to ensure safe mine design |
en |
dc.type |
Conference Presentation |
en |
dc.identifier.apacitation |
Coetzer, S. (1997). Conceptual development of a method to determine the principal stresses around coal mine workings to ensure safe mine design. http://hdl.handle.net/10204/1416 |
en_ZA |
dc.identifier.chicagocitation |
Coetzer, S. "Conceptual development of a method to determine the principal stresses around coal mine workings to ensure safe mine design." (1997): http://hdl.handle.net/10204/1416 |
en_ZA |
dc.identifier.vancouvercitation |
Coetzer S, Conceptual development of a method to determine the principal stresses around coal mine workings to ensure safe mine design; 1997. http://hdl.handle.net/10204/1416 . |
en_ZA |
dc.identifier.ris |
TY - Conference Presentation
AU - Coetzer, S
AB - The objective of this project is to identify or to develop methods or procedures for the determination of the principal stresses in coal mine workings, which in turn would provide improved criteria for mine design layouts in coal mines. To address the objective a survey of 52 papers was carried out to identify methods which could be of use for the determination of in situ stresses in coal mines. This survey showed that the majority of methods used to measure stress in coal seam and then over-cored by a larger diameter hole which results in the stresses acting on the sensor being relaxed
DA - 1997-06
DB - ResearchSpace
DP - CSIR
KW - SIMRAC
KW - COL 326
KW - Safe mine design
KW - Coal mine workings
LK - https://researchspace.csir.co.za
PY - 1997
T1 - Conceptual development of a method to determine the principal stresses around coal mine workings to ensure safe mine design
TI - Conceptual development of a method to determine the principal stresses around coal mine workings to ensure safe mine design
UR - http://hdl.handle.net/10204/1416
ER -
|
en_ZA |