dc.contributor.author |
Wright, Jarrad G
|
|
dc.contributor.author |
Calitz, Joanne R
|
|
dc.date.accessioned |
2019-04-12T07:58:35Z |
|
dc.date.available |
2019-04-12T07:58:35Z |
|
dc.date.issued |
2019-04 |
|
dc.identifier.citation |
Wright, J.G, and Calitz, J.R. 2019. Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019). A presentation delivered by the CSIR Energy Centre, 9 April 2019 |
en_US |
dc.identifier.uri |
http://hdl.handle.net/10204/10959
|
|
dc.description |
Presentation delivered by the CSIR Energy Centre during April 2019. |
en_US |
dc.description.abstract |
The RSA power system again became constrained in Q1-2019 with Eskom needing to loadshed (to Stage 4 at times). Causes of leadshedding have been cited as high unplanned plant failures on the thermal coal fleet, depleted diesel (OCGTs) and water (pumped storage) combined with the loss of Cahora Bassa import from Mozambique. This has been the most intensive loadshedding experienced in RSA with 595 GWh of load shed just in March 2019 of the total 769 GWh in Q1-2019 (there was 1325 GWh of loadshedding throughout 2015). |
en_US |
dc.language.iso |
en |
en_US |
dc.publisher |
CSIR |
en_US |
dc.subject |
Renewable energy |
en_US |
dc.subject |
Loadshedding |
en_US |
dc.title |
Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019) |
en_US |
dc.type |
Conference Presentation |
en_US |
dc.identifier.apacitation |
Wright, J. G., & Calitz, J. R. (2019). Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019). CSIR. http://hdl.handle.net/10204/10959 |
en_ZA |
dc.identifier.chicagocitation |
Wright, Jarrad G, and Joanne R Calitz. "Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019)." (2019): http://hdl.handle.net/10204/10959 |
en_ZA |
dc.identifier.vancouvercitation |
Wright JG, Calitz JR, Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019); CSIR; 2019. http://hdl.handle.net/10204/10959 . |
en_ZA |
dc.identifier.ris |
TY - Conference Presentation
AU - Wright, Jarrad G
AU - Calitz, Joanne R
AB - The RSA power system again became constrained in Q1-2019 with Eskom needing to loadshed (to Stage 4 at times). Causes of leadshedding have been cited as high unplanned plant failures on the thermal coal fleet, depleted diesel (OCGTs) and water (pumped storage) combined with the loss of Cahora Bassa import from Mozambique. This has been the most intensive loadshedding experienced in RSA with 595 GWh of load shed just in March 2019 of the total 769 GWh in Q1-2019 (there was 1325 GWh of loadshedding throughout 2015).
DA - 2019-04
DB - ResearchSpace
DP - CSIR
KW - Renewable energy
KW - Loadshedding
LK - https://researchspace.csir.co.za
PY - 2019
T1 - Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019)
TI - Brief analysis of variable renewable energy contribution during loadshedding (Q1-2019)
UR - http://hdl.handle.net/10204/10959
ER -
|
en_ZA |